Home › Tools › Planning permission checker
Planning permission checker
A plain-English guide to permitted development for air source heat pumps, rooftop solar panels and wall-mounted EV chargepoints in England, with planning links for the 34 East Midlands council areas we cover.
Official sources checked: 11 November 2026 · Council links checked: 11 November 2026
Frequently asked questions
Do rooftop solar panels need planning permission in England?
They can be permitted development if the applicable limits and conditions are met. The current guidance says panels on a pitched roof must not rise above the highest part of the roof and may project no more than 200 mm; on a flat roof, the equipment may be no more than 600 mm above the highest part of the roof. Flat-roof solar on Article 2(3) land needs prior approval. The August 2026 rules have a transition period to 27 August 2027, during which either the previous or new rules may be used.
What are the main permitted development limits for a domestic air source heat pump?
The current Planning Portal guidance requires MCS 020a, limits the outdoor compressor volume to 1.5 cubic metres for a house and 0.6 cubic metres for a block of flats, and allows one unit on a non-detached house or block of flats and two on a detached house. Other siting and location conditions apply, and permitted development rights do not apply within the curtilage of a listed building or on a scheduled monument.
Can a wall-mounted home EV chargepoint be permitted development in a conservation area?
The current Class D guidance says an electrical charging outlet within the curtilage of a dwellinghouse or block of flats must not be in a conservation area to use this permitted development right. The outlet also has limits on volume, height and position beside a highway. Check with the local planning authority about the property and proposal.
Can an Article 4 direction affect permitted development rights?
Yes. GOV.UK says a local planning authority can use an Article 4 direction to remove specified permitted development rights. The relevant limits depend on the direction and the property, so check the council’s planning pages.
Who should I contact if I am unsure whether I need planning permission?
Check with the local planning authority for the property. Use the council links in the table below, and check whether the property is within the Peak District National Park boundary where relevant.