Home › Data › Smart Export Guarantee rates
Smart Export Guarantee (SEG) rates compared – East Midlands, Nov 2026
A source-linked snapshot of public export tariffs from every supplier on Ofgem’s current SEG licensee list. Higher rates can depend on who supplies your electricity or who installed your system.
Last checked: 22 Nov 2026 · Ofgem’s 2026/27 list has 12 mandatory and 4 voluntary licensees.
Ofgem’s list is for the SEG year from 1 April 2026 to 31 March 2027. A SEG licensee pays for eligible exported electricity measured by an export meter; its tariff can be separate from your import electricity supply. Rates and terms can change, so check the linked supplier page and written tariff before applying. Ofgem’s current SEG supplier list.
Published SEG and export tariff rates
Rows start with the highest single published rate. Agile Outgoing is shown as a dated half-hourly range because it has no single rate. “Not stated” means the checked supplier page or API did not say.
| Source | Copy | ||||||
|---|---|---|---|---|---|---|---|
| OVOMandatory SEG licensee | SEG Install Exclusive Not stated on tariff page Rate is an upper rate; OVO's main SEG page also says it pays 15p/kWh if it installs solar panels only. | Up to 20p (15p if OVO installs solar only) | Yes | MCS-certified system or equivalent | Yes; this offer is for OVO-installed solar and home storage battery | Supplier page / API | |
| So EnergyMandatory SEG licensee | Solar SEG offer (tariff name not stated on page) Not stated on page Kept as a separate page-published offer, not treated as the named So Export Flex tariff. Dedicated SEG page says: So Export Flex is 4.5p/kwh (incl. VAT). | 20p (separate solar-page offer; terms not stated) | No import switch stated; exact offer eligibility not stated | MCS certificate or equivalent is required for the SEG application | Not stated for this offer | Supplier page / API | |
| EDFMandatory SEG licensee | Export Exclusive 12m V3 Fixed for 12 months The 18p tariff requires an EDF solar and/or battery purchase and residential EDF supply. | 18p | Yes; existing residential EDF electricity customer | MCS or Flexi-Orb certificate; page calls this out for battery-only purchases | Yes; EDF says export from an eligible renewable installation linked to battery storage is eligible | Supplier page / API | |
| E.ON NextMandatory SEG licensee | Next Export Premium v3 Fixed for 12 months One tariff per property; the page says no exit fees. | 17.5p | No; tariff eligibility lists the E.ON installation and system-size conditions, and E.ON accepts applicants whose import supply is elsewhere | MCS or Flexi-Orb certificate | Not stated; tariff eligibility includes a solar and/or battery installation | Supplier page / API | |
| ScottishPowerMandatory SEG licensee | SmartGen Premium Plus Variable ScottishPower's page states prices effective from 2 August 2025 and subject to change. | 15p | Yes; ScottishPower electricity supply at the installation address | MCS, Flexi-Orb or similar certified installation | Not stated for battery export; a ScottishPower-installed battery can qualify for this tariff | Supplier page / API | |
| E.ON NextMandatory SEG licensee | Next Export Exclusive v3 Fixed for 12 months E.ON excludes time-of-use import tariffs such as Next Drive. | 13p | Yes; eligible E.ON Next import tariff (time-of-use tariffs excluded) | MCS or Flexi-Orb certificate | Not stated | Supplier page / API | |
| EDFMandatory SEG licensee | Export 12m V2 Fixed for 12 months EDF page states this rate is available to existing residential EDF electricity customers. | 13p | Yes; existing residential EDF electricity customer | MCS certificate; Flexi-Orb certificate accepted for battery-only purchase | Yes; EDF permits export from eligible renewable generation linked to battery storage | Supplier page / API | |
| Fuse EnergyMandatory SEG licensee | Single Rate Variable Export Variable; reviewed quarterly Supplier page says rate is reviewed quarterly and payments are credited monthly. | 13p | No; export-only customers are welcome | MCS certificate or equivalent | Yes; Fuse says home solar systems with or without a battery can qualify | Supplier page / API | |
| British GasMandatory SEG licensee | Export Premium Variable British Gas says this is its best rate and that its rate can go up or down. | 12p | Yes; British Gas electricity customer | MCS or equivalent; Flexi-Orb accepted in British Gas SEG eligibility information | Yes; British Gas says SEG payments can cover electricity exported from a battery | Supplier page / API | |
| Octopus EnergyMandatory SEG licensee | Outgoing Octopus Variable tariff with flat unit rate; changes with notice Region B API unit rate. Octopus' public tariff page says Outgoing customers must be on Octopus and that only certain import tariffs can be paired with it. | 12p | Yes; must be an Octopus Energy customer and use a compatible import tariff | Not stated on the checked tariff page or product API | Yes; Octopus describes the offer for homes with battery storage | Supplier page / API | |
| OVOMandatory SEG licensee | SEG Beyond Exclusive Not stated on tariff page OVO's page advertises this rate for OVO import customers. | 12p | Yes; OVO supplies the home | MCS-certified system or equivalent | Yes; OVO says customers can apply for any of its SEG tariffs with a battery | Supplier page / API | |
| ScottishPowerMandatory SEG licensee | SmartGen Premium Variable ScottishPower's page states prices effective from 2 August 2025 and subject to change. | 12p | Yes; ScottishPower electricity supply at the installation address | MCS, Flexi-Orb or similar certified installation | Not stated | Supplier page / API | |
| British GasMandatory SEG licensee | Export Extra Variable System capacity and import-supplier eligibility apply. | 8p | Yes; British Gas electricity customer | MCS or equivalent; Flexi-Orb accepted in British Gas SEG eligibility information | Yes; British Gas says SEG payments can cover electricity exported from a battery | Supplier page / API | |
| Utility WarehouseMandatory SEG licensee | UW Smart Export Guarantee - Bundle Standard Variable UW says the 8p rate applies while the required bundled services remain active. | 8p | Yes; UW energy supply plus at least two additional services | Not stated on current tariff page | Not stated | Supplier page / API | |
| British GasMandatory SEG licensee | Export VoidCare SEG Variable This is a social-landlord/VoidCare tier. | 6p | Yes; British Gas VoidCare customer | MCS or equivalent; Flexi-Orb accepted in British Gas SEG eligibility information | Yes; British Gas says SEG payments can cover electricity exported from a battery | Supplier page / API | |
| E.ON NextMandatory SEG licensee | Next Flex Export v1 Variable Page lists new and existing customers and no E.ON import requirement for this tariff. | 6p | No import requirement stated; page says eligible new and existing customers | MCS or Flexi-Orb certificate | Not stated | Supplier page / API | |
| ScottishPowerMandatory SEG licensee | SmartGen Variable ScottishPower's page states prices effective from 2 August 2025 and subject to change. | 6p | No; standard SmartGen is available without ScottishPower import supply | MCS, Flexi-Orb or similar certified installation | Not stated | Supplier page / API | |
| EDFMandatory SEG licensee | SEG Export Variable Value Variable EDF page states this tier is exclusive to EDF electricity customers. | 5.6p | Yes; EDF electricity customer | MCS or Flexi-Orb certificate | Yes; EDF allows eligible renewable generation linked to battery storage | Supplier page / API | |
| Pozitive EnergyVoluntary SEG licensee | PE Smart Export Guarantee Not stated on page PE says export payments can be offset against its energy bill if it supplies the import meter; it does not state that import supply is required. | 5p | Not stated | MCS or equivalent | No; page says battery-stored electricity does not qualify | Supplier page / API | |
| SmartPay EnergyVoluntary SEG licensee | Smart Export Guarantee (SEG) Not stated on page Page says payments are made twice a year and may be offset against its energy bill when it supplies the import meter. | 5p | Not stated | MCS or equivalent | No; page lists battery-stored electricity as ineligible | Supplier page / API | |
| So EnergyMandatory SEG licensee | So Export Flex Not stated on current rate summary Dedicated SEG page calls this its current named SEG rate. A separate solar page advertises 20p/kWh without naming a tariff or terms; see separate row and verification log. | 4.5p | No; So Energy explicitly says customers can keep their current supplier | MCS certificate or equivalent | Not stated | Supplier page / API | |
| Octopus EnergyMandatory SEG licensee | Octopus Outgoing Smart Export Guarantee October 2026 v1 Fixed for 12 months Region B API product record. API says tariff name: Octopus Outgoing Smart Export Guarantee October 2026 v1; description says SEG export tariff and £100 exit fee. | 4.1p | Not stated in the API product fields | Not stated in the API product fields | Not stated in the API product fields | Supplier page / API | |
| OVOMandatory SEG licensee | SEG Not stated on tariff page OVO's main SEG page says this is the standard tariff. | 4p | No; electricity can be supplied by any provider | MCS-certified system or equivalent | Yes; OVO says customers can apply for any of its SEG tariffs with a battery | Supplier page / API | |
| Voltx PowerVoluntary SEG licensee | Voltx Power SEG tariff Not stated on page Voltx says payments are made twice a year and can be offset against its energy bill if it supplies imports. | 3.02p | Not stated | MCS or equivalent | Not stated | Supplier page / API | |
| British GasMandatory SEG licensee | Export SEG Variable British Gas says non-customers receive Export SEG. | 3p | No; available to non-British Gas electricity customers | MCS or equivalent; Flexi-Orb accepted in British Gas SEG eligibility information | Yes; British Gas says SEG payments can cover electricity exported from a battery | Supplier page / API | |
| EMandatory SEG licensee | SEG Tariff Variable E's public support page gives the 3p rate. | 3p | Not stated | MCS or equivalent | Not stated | Supplier page / API | |
| Ruby EnergyVoluntary SEG licensee | Ruby SEG tariff Page contains both variable-rate and fixed-rate wording The same page later calls its rate fixed; confirm the signed terms because the page is internally inconsistent. | 3p | No; Ruby says no import tariff switch is required | MCS or equivalent | Not stated | Supplier page / API | |
| UtilitaMandatory SEG licensee | Utilita Smart Export Guarantee Not stated on page Utilita asks for proof of identity and ownership. | 3p | Not stated | MCS or equivalent for installation and installer | Not stated | Supplier page / API | |
| EDFMandatory SEG licensee | SEG Export Variable Variable The current page explicitly dates the rate change to 28 October 2026. | 2p | No; available to EDF and non-EDF customers | MCS certificate; Flexi-Orb certificate accepted for battery-only purchase | Yes; EDF permits export from eligible renewable generation linked to battery storage | Supplier page / API | |
| Utility WarehouseMandatory SEG licensee | UW Smart Export Guarantee - Standard Standard Variable UW page states effective from 1 May 2022. | 2p | No; UW says available to everyone | Not stated on current tariff page | Not stated | Supplier page / API | |
| Octopus EnergyMandatory SEG licensee | Agile Outgoing Octopus Variable half-hourly Not a fixed price and not ranked by a single p/kWh figure. Range is only the dated interval snapshot returned by the API. | Variable half-hourly; 22 Nov API snapshot: 14.61–25.90p | Yes; must be an Octopus Energy customer and use a compatible import tariff | Not stated on the checked tariff page or product API | Yes; Octopus describes Outgoing as suitable for homes with battery storage | Supplier page / API | |
| Outfox EnergyMandatory SEG licensee | Rate not published / check supplier Not published on the checked supplier site Secondary-site rates were not used. Ask Outfox for its current export tariff and terms. | Rate not published / check supplier | Not stated | Not stated on the checked page | Not stated | Supplier page / API |
Rates are initially sorted highest first. Use the column headings to sort.
Worked example: what 50% export could earn
This is an estimate, not a bill forecast. The PVGIS data page reports an unweighted average of 943.5 kWh per kWp per year across 34 authority-centre locations. A 4 kWp system at that average would generate about 3,774 kWh/year; exporting an assumed 50% gives about 1,887 kWh/year.
| Tariff | Rate | Estimated payment |
|---|---|---|
| OVO — SEG Install Exclusive | 20p/kWh | £377/year |
| So Energy — Solar SEG offer (tariff name not stated on page) | 20p/kWh | £377/year |
| EDF — Export Exclusive 12m V3 | 18p/kWh | £340/year |
Calculation: 4 kWp × 943.54 kWh/kWp × 50% exported × tariff rate. It assumes the same export share throughout the year, ignores tariff changes and eligibility, and does not include import savings. See the PVGIS solar-generation data and try the solar payback calculator.
How to get paid under SEG
- Keep your MCS or equivalent certificate. Ask your installer for the certificate and any grid-connection paperwork (G98/G99) the supplier requests.
- Make sure export is metered. You need an export meter or a smart meter that can record and send export readings. Ask the supplier whether it will arrange an export MPAN.
- Apply to a SEG licensee. Compare the rate and eligibility terms, send the requested documents and meter details, then follow its process for readings and payments.
Ofgem says the SEG supplier can be different from your import electricity supplier. Some headline tariffs still require you to import from that supplier or buy the solar/battery system from it.
Frequently asked questions
What is the Smart Export Guarantee?
The SEG is a scheme under which participating electricity suppliers pay eligible generators for metered renewable electricity exported to the grid. You have to apply to a SEG licensee; export payments are not automatic. Ofgem says the SEG supplier does not have to be your import electricity supplier.
Which SEG tariff pays the highest rate?
Among the supplier pages checked, OVO advertises up to 20p/kWh on SEG Install Exclusive. It requires OVO to supply the home's electricity and install the solar panels and battery. So Energy separately advertises 20p/kWh on a solar page without naming the offer or its terms; its dedicated SEG page names So Export Flex at 4.5p/kWh.
Do I have to switch my electricity supplier to get SEG?
No. Ofgem says your SEG licensee can be different from your electricity supplier. Of the published tariffs checked here, E.ON Next's Next Export Premium v3 is the highest rate whose public eligibility says an import switch is not required; it pays 17.5p. Some other higher rates are tied to import supply or an installation bought from the supplier.
Do I need an MCS certificate and a smart meter?
Most suppliers ask for an MCS certificate or an equivalent scheme certificate and export meter readings. A smart meter that records export is commonly accepted, but suppliers set their own application requirements. Check the source link for the tariff you plan to use.
Can I export electricity stored in a home battery?
It depends on the supplier and the system. Some suppliers expressly accept battery-linked exports; others say battery-stored electricity does not qualify, and several do not state a rule on their public page. The table records what each checked source says.
Sources and method
- Ofgem, Smart Export Guarantee Supplier List. The page lists current mandatory and voluntary licensees for 1 April 2026–31 March 2027.
- Rates and eligibility notes come from each linked supplier page. Octopus Outgoing, its fixed SEG product and Agile Outgoing use the public Octopus products API with Region B for the East Midlands.
- The worked example uses kWh per kWp values in our PVGIS solar-generation dataset, fetched 2 November 2026. It averages each of the 34 authority-centre locations equally.
- Rates are not guaranteed for a new application. Supplier pages may use different eligibility rules for domestic, business, battery and installer-linked offers. “Rate not published / check supplier” is not a zero rate.
Last checked 22 Nov 2026. SEG rates and supplier conditions change. Confirm the current rate and full terms directly with the supplier before applying.
Licence: This comparison is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0). The tariff wording itself remains each supplier’s; check the linked source pages before relying on a rate.
Cite as: East Mids Energy, Smart Export Guarantee (SEG) rates compared – East Midlands, Nov 2026. https://eastmidsenergy.co.uk/data/smart-export-guarantee-rates/. CSV: smart-export-guarantee-rates.csv.