Large solar farms in the East Midlands: which are approved and which are still in planning
A Planning Inspectorate register tracker of large solar schemes in and around Nottinghamshire, Derbyshire, Leicestershire and Staffordshire.
Consent for Great North Road Solar and Biodiversity Park on 27 October prompted this tracker. The Planning Inspectorate’s “solar” search returned 45 projects. We also searched “energy park” and “renewable”, then reviewed the project pages and mapped available location boundaries.
| Project | Council area / location | Register stage | Capacity stated on PINS page | PINS page |
|---|---|---|---|---|
| Whitestone Solar Farm | Main location: about 8km east of Rotherham, within Doncaster and Rotherham; the PINS boundary download also reaches Derbyshire (Bolsover and North East Derbyshire). | Pre-examination — still in planning | Up to 750 MW | Project page |
| Great North Road Solar and Biodiversity Park | Newark and Sherwood, Nottinghamshire; north-west of Newark-on-Trent | Post-decision — consent granted 27 October 2026 | Maximum generation capacity 800 MW | Project page |
| Steeple Renewables Project | Bassetlaw, Nottinghamshire; the page gives the location as Nottinghamshire | Post-decision — consent granted 9 October 2026 | About 450 MW solar generation and about 150 MW battery storage | Project page |
| One Earth Solar Farm | Bassetlaw and Newark and Sherwood, Nottinghamshire, and West Lindsey, Lincolnshire; around the River Trent | Post-decision — consent granted 8 July 2026 | More than 50 MW | Project page |
| Tillbridge Solar Project | Bassetlaw, Nottinghamshire, and West Lindsey, Lincolnshire; east and south-east of Gainsborough | Post-decision — granted 14 October 2025 | Anticipated capacity above 50 MW | Project page |
| Oaklands Farm Solar Park | South Derbyshire, Derbyshire; Rosliston Road, south of Drakelow Power Station | Post-decision — granted 19 June 2025 | Not stated on the PINS page | Project page |
| West Burton Solar Project | Bassetlaw, Nottinghamshire, and West Lindsey, Lincolnshire; south of Sturton by Stow and south-east of Marton | Post-decision — granted 24 January 2025 | Four generating stations, each expected to exceed 50 MW | Project page |
| Cottam Solar Project | Bassetlaw, Nottinghamshire, and West Lindsey, Lincolnshire; Cottam 1 is east of Willingham by Stow, Normanby by Stow and Stow | Post-decision — granted 5 September 2024 | Up to 600 MW | Project page |
| Gate Burton Energy Park | Bassetlaw, Nottinghamshire, and West Lindsey, Lincolnshire; about 4km south of Gainsborough | Post-decision — granted 12 July 2024 | Up to 500 MW | Project page |
The register marks eight of these projects post-decision and records a consent grant for each. Whitestone is at pre-examination. Pre-application is when a developer develops its proposal and consults; examination is the inspectors’ formal review, with registered people able to comment. After examination, the Examining Authority sends a recommendation to the Secretary of State, who makes the decision.
The council areas above were checked by overlaying the PINS boundary downloads on ONS boundary data. PINS says its displayed project boundaries are illustrative, so check the project plans for exact limits. The written location on Whitestone’s page names Doncaster and Rotherham; its linked boundary download also reaches Derbyshire. Checked against the Planning Inspectorate register on 29 October 2026.
Consent for a grid-scale project does not by itself change a household’s bill or tariff. For household solar, browse installers in Newark and Sherwood and Bassetlaw, see solar options across Derbyshire, or try the solar payback calculator. Read our Great North Road consent report for the decision details.
Sources
- Planning Inspectorate register searches: solar, energy park and renewable. Each table row links to its project page.
- Office for National Statistics boundary data: Counties and Unitary Authorities, December 2025 and Local Authority Districts, May 2025.
Source: Planning Inspectorate project register: solar, energy park and renewable searches