Public EV charger cyber rules proposed: what it means in our four-county area
OZEV is consulting on cyber security requirements for public EV chargepoints, with no retrofit proposed and implementation dates still to be decided.
The Department for Transport is asking whether public electric vehicle (EV) chargepoints sold or installed in Great Britain should meet a consistent cyber security baseline. Its consultation is relevant to drivers using public chargers across our four-county area, but it proposes no immediate change to equipment already in use.
The consultation document proposes that public chargepoints meet ETSI 303 645, a baseline standard for connected devices. OZEV is considering whether EN 18031 could count as an equivalent route. It also proposes extra physical anti-tamper protection, with options including seals or sensors that detect access and notify the owner, plus a meter meeting the Measuring Instruments Regulations 2016 (at least Class B). Those metering rules already cover chargers that sell electricity by measured quantity, which the consultation says includes most public chargepoints; the proposal would make manufacturers fit a compliant meter in every public chargepoint sold or installed in Great Britain.
The proposed product requirements would apply to people selling or installing public chargepoints in Great Britain, mainly manufacturers and businesses importing or distributing devices for the GB market. The consultation asks chargepoint operators about their current compliance and costs. A later phase could add cyber security duties for chargepoint operators and e-mobility service providers, but that is a possibility described for future consideration.
For drivers, the consultation says cyber attacks could disrupt charging and affect drivers, businesses and infrastructure. The proposed meter requirement is also intended to reduce tampering fraud and support accurate measurement. If the proposals proceed, they would apply to public chargepoints sold or installed under the eventual rules; there would be no retrofit requirement, and replacement devices would need to comply when existing units are decommissioned. The government encourages early implementation if it proceeds, but has not set a timetable. It is asking for views on how long manufacturers and operators would need.
This proposal addresses a gap the consultation identifies: it says there are currently no specific cyber security requirements for public chargepoints. By contrast, the Electric Vehicles (Smart Charge Points) Regulations 2021 already require cyber security measures for domestic and small non-domestic chargers, excluding public points; the consultation says those requirements are due to be replaced in due course by proposed Energy Smart Appliance Regulations. The consultation does not discuss the separate Public Charge Point Regulations 2023. Our smart charger rules guide explains the existing requirements for home and workplace chargers.
The consultation closes at 11:59pm on 20 December 2026. OZEV says the easiest way to respond is its online form. The local county pages cover Derbyshire, Nottinghamshire and Leicestershire, plus Staffordshire in the West Midlands: our four-county area.
Source: GOV.UK – OZEV – Public electric vehicle charge points: cyber security