Cross-pavement EV charging is live: what East Midlands renters need to know
New planning rules for cross-pavement home charging are now in force, as consultations open on charger access for renters and building regulations.
From today, qualifying cross-pavement home EV charger installations no longer need a planning application in England. That is the practical change for East Midlands drivers who park on the street: a cable can connect a home charger to a car at the kerb through an authorised pavement channel, subject to the other permissions still needed.
The government says removing planning permission could save up to £300 on installation. It says charging at home could cost as little as 2p per mile and bring up to £1,750 in running-cost savings. These are government estimates, not guaranteed savings for every driver.
Live today, with conditions
The new permitted development rules take effect on 21 October. Planning permission is only one hurdle: residents still need the highway authority’s agreement for a pavement channel, and tenants or leaseholders still need landlord or freeholder consent. The route excludes conservation areas, listed buildings and scheduled monuments. Our 16 October explainer sets out the order’s scope and restrictions. For practical next steps, see our guides to cross-pavement charger permission, charging without a driveway and charging on a terraced street. Renters and flat owners can also read our charger grant guide.
Two consultations open until December
The government opened two consultations today, both closing at 23:59 on 16 December 2026. One asks whether to introduce an “ability to charge” to streamline landowner permission for tenants and leaseholders. It also seeks views on clearer guidance and whether landlords and freeholders should face requirements that could make refusals harder. These are proposals for feedback, not rules already in force. Respond to the tenants and leaseholders consultation.
The second consultation considers changes to Part S of the building regulations, including extending chargepoint requirements to covered car parks and reviewing the £3,600 installation cap to account for inflation since 2021. Part S covers new buildings and major renovations; the consultation also seeks views on wider changes. Respond to the building regulations consultation.
Residents across the East Midlands can respond. For pavement channels, the highway authority is the county council in most of Derbyshire, Nottinghamshire, Leicestershire and Staffordshire; in Derby, Nottingham, Leicester and Stoke-on-Trent it is the city council. Check what agreement and channel arrangements apply before booking an installer.
Find a local EV charger installer at East Mids Energy.