Home › Derbyshire › High Peak › New Mills

Heat pump, solar panel and battery installation in New Mills

We list 3 heat pump installers, 5 solar panel installers, 4 home battery installers and 10 EV charger installers within 20 km of New Mills or based in High Peak. In the 2021 Census area covering central New Mills, 2.8% of households used oil or LPG only for central heating, according to ONS Census 2021 TS046. 9 home energy installer listings are within 20 km of New Mills centre in our directory; the nearest, Green Peak Electrical Group Ltd, is about 1.7 km away. Counting firms within 20 km or based anywhere in High Peak, the directory has 10 for EV chargers, 5 for solar panels, 4 for battery storage and 3 for heat pumps. Distances are straight-line estimates.

15 listings shown1.7 km nearest straight-line distance
Ask nearby installers for a free quote
Stone and brick homes on a village street with rolling hills in the background

Heat pump, solar panel and battery installation in New Mills

Compare nearby directory firms, current heat pump grant and VAT rules, and the planning checks to make before arranging work in New Mills.

Directory firms by technology

Counts combine listings within 20 km straight-line of the New Mills centre and firms based anywhere in High Peak, deduplicated by business. They show directory service labels and proximity, not a guarantee that each firm covers every postcode. No MCS register data is used or displayed in these counts.

Grant and VAT

The Boiler Upgrade Scheme lists a £7,500 grant for eligible air-to-water and ground-source heat pump installations in England and Wales. Other property and system categories have different grant values, so check the current rules before relying on a grant. GOV.UK Boiler Upgrade Scheme grant values.

Qualifying installations in residential accommodation of solar panels, permanently fixed air-source heat pumps and electrical storage batteries are zero-rated for VAT through 31 March 2027. HMRC includes batteries added to existing solar, standalone grid batteries and batteries using both grid and solar electricity. The relief applies to installation work; buying equipment without installation is treated differently. HMRC VAT Notice 708/6, sections 2.1, 2.7, 2.11, 2.15 and 2.19.

Planning checks in New Mills

Conservation area: New Mills Conservation Area is designated. Its boundary covers only part of the town; check the council map for a property address. High Peak Borough Council: conservation area maps for New Mills.

In England, an air-source heat pump may be permitted development only when all applicable limits and conditions are met. Siting restrictions apply in conservation areas and World Heritage Sites; permitted development rights do not apply to installations within the curtilage of a listed building. Article 4 directions and planning conditions can also affect rights. Planning Portal: air-source heat pump planning permission.

Solar panels on a house may be permitted development in England if the relevant limits and conditions are met. Under the updated rules, equipment in a conservation area must not be fitted to a wall, balcony or roof enclosure fronting a highway; a transition lets some installations use the previous rules until 27 August 2027. Siting and property status matter, so check the full rules with the local planning authority before work starts. Planning Portal: detailed solar panel rules for homes.

If proposed work would affect the character of a listed building, listed building consent is required; planning permission may also be needed. Planning (Listed Buildings and Conservation Areas) Act 1990, sections 7 and 8. Check with High Peak Borough Council planning and buildings before work starts.

Electricity network: Electricity North West's network-planning report lists New Mills among the settlements in its Stalybridge Grid Supply Point area of supply. For a property's exact distributor, check using its full postcode, especially near an area boundary. Electricity North West: Distribution Network Options Assessment (2024), Stalybridge GSP.

Guides and tools

Questions about installations in New Mills

How many heat pump installation firms are listed near New Mills?

The directory lists 3 heat pump firms within 20 km of New Mills centre or based in High Peak. This is a proximity-based directory count, not confirmation that every firm covers every postcode.

How many solar panel installation firms are listed near New Mills?

The directory lists 5 solar panel firms within 20 km of New Mills centre or based in High Peak. This is a proximity-based directory count, not confirmation that every firm covers every postcode.

How many battery storage installation firms are listed near New Mills?

The directory lists 4 battery storage firms within 20 km of New Mills centre or based in High Peak. This is a proximity-based directory count, not confirmation that every firm covers every postcode.

What heat pump grant is available in New Mills?

The Boiler Upgrade Scheme lists £7,500 for eligible air-to-water and ground-source heat pump installations in England and Wales. Eligibility conditions and other grant categories apply; check GOV.UK for the current rules.

Is VAT 0% on heat pumps, solar panels and batteries in New Mills?

Qualifying installations in residential accommodation of solar panels, permanently fixed air-source heat pumps and electrical storage batteries are zero-rated through 31 March 2027. HMRC VAT Notice 708/6 sets out which installation supplies qualify.

Do heat pumps and solar panels need planning permission in New Mills?

They may be permitted development in England if the relevant limits and conditions are met. New Mills has a designated Conservation Area, but only properties inside its mapped boundary are within it. Conservation-area and listed-building rules can change the planning route; check the property with High Peak Borough Council before work starts.

Local sources checked 26 November 2026. Planning requirements depend on the property and the proposed installation.

Local home energy installers

These are listings from our live directory. EV chargepoint authorisation details for OZEV listings are sourced from the GOV.UK OZEV installer finder; distances use the location coordinates recorded for each directory entry. The OZEV authorisation shown on a profile applies to EV chargepoint work. Distances are straight-line estimates, not driving distances. Unclaimed heat-pump, solar, battery and EV-charger listings in this district are based on Companies House records and the firm's own website; they are not OZEV-authorised.

JSA Electrical

Buxton · SK17

About 13.9 km from the New Mills centre

EV chargers

OZEV-authorised for EV chargers

The list also includes 6 unclaimed business listings in High Peak.

Installers near New Mills by technology

Heat pump installers near New Mills

3 listings near New Mills or based in High Peak say they offer heat pumps.

Browse heat pump installers in High Peak

The Boiler Upgrade Scheme guide explains current grant eligibility for heat pumps.

Cold snap coming? See the 7-day heat pump cold-weather forecast for New Mills and what frost and defrost mean for your heat pump.

Check what a heat-pump quote includes with the AI quote checker.

Solar panel installers near New Mills

5 listings near New Mills or based in High Peak say they offer solar panels.

Browse solar panel installers in High Peak

Check the solar and heat pump planning guide, then estimate local generation and payback with the solar payback calculator.

Home battery installers near New Mills

4 listings near New Mills or based in High Peak say they offer battery storage.

Browse battery storage installers in High Peak

The home battery guide covers adding storage to solar; compare tariff-shifting savings with the home battery savings calculator.

Looking for Tesla Powerwall installation near New Mills? Read our Tesla Powerwall installer guide.

EV charger installers near New Mills

10 listings near New Mills or based in High Peak say they offer EV chargers.

Browse EV charger installers in High Peak

The GOV.UK OZEV installer finder lists authorised EV chargepoint installers; our DNO notification guide explains the home charger process.

The directory does not verify MCS certification. Before booking solar or heat pump work, check the company on MCS's Find an Installer checker.

Planning: heat pumps and solar panels in New Mills

National Park boundary: New Mills is outside the Peak District National Park. The wider boundary is close by, so the planning authority can differ for properties beyond the town.

Local planning authority: High Peak Borough Council.

Conservation areas: New Mills Conservation Area is designated. Its boundary covers only part of the town; check the council map for a property address.

For a heat pump installation in New Mills, an air source heat pump may be permitted development if it meets all the relevant limits and conditions. In a conservation area or World Heritage Site, it cannot be installed on a wall or roof facing a highway, or closer to a highway that bounds the property than the nearest part of the home. On other land, including National Park land outside a conservation area or World Heritage Site, a unit on a highway-facing wall cannot be above ground-floor level. Check for property-specific restrictions such as an Article 4 Direction. Read our heat pump planning permission guide.

For a solar panel installation in New Mills, panels on a flat roof on Article 2(3) land (including a National Park or conservation area) need a prior-approval application before work starts; the authority decides whether approval is required. A stand-alone system on Article 2(3) land and within five metres of the property's curtilage boundary also needs a prior-approval application. Current rules exclude panels on a wall, balcony or roof enclosure facing a highway in a conservation area or World Heritage Site. The rules changed on 27 August 2026, with transitional arrangements for some installations until 26 August 2027. Read our solar planning guide.

If a property is listed, works that affect its character as a listed building need listed building consent; planning permission may also be required.

This is general guidance, not planning advice; check with High Peak Borough Council before you install. Checked 17 November 2026.

How homes in New Mills are heated

In the Census 2021 area that covers central New Mills (New Mills West & Furness Vale, 3,429 households), 77.3% of households had mains gas as their only central heating, compared with 79.2% across High Peak.

2.8% (95 households) used oil or tank/bottled gas (LPG) only (2.6% across High Peak), and 5.2% (180) used electric heating only. 6 households already used renewable energy only, such as a heat pump.

Oil and LPG heating usually means a home is not on mains gas. If you are weighing up a heat pump in New Mills, the Boiler Upgrade Scheme guide explains which existing heating systems qualify, and the off-gas-grid homes data page compares every East Midlands council area.

Source: Office for National Statistics, Census 2021 TS046 central heating (Nomis), area High Peak 005 (E02004097); Open Government Licence v3.0. The area was found from the postcode nearest the New Mills centre (postcodes.io); area name from the House of Commons Library MSOA names. Census areas do not match town boundaries exactly, and heating may have changed since 21 March 2021.

District-level figures for High Peak

Public EV charging: High Peak had 97 public chargepoints on 1 October 2026. This is a High Peak council-area figure, not a count for New Mills. Source: DfT EVCI0102 (Zapmap data, Open Government Licence v3.0).

Solar PV: DESNZ recorded 2,004 solar PV installations in High Peak at the end of 2025. This is a district-level figure, not a count for New Mills; DESNZ says the 2025 allocations may be revised. Source: DESNZ renewable electricity statistics (Open Government Licence v3.0).

Useful next steps

OZEV installer records were last checked against the GOV.UK finder on 14 October 2026. Unclaimed business listings are based on Companies House records and website evidence. Technology tags are not an MCS endorsement.

Get free quotes from installers in New Mills

Free and no obligation. We send your request to the installer(s) you choose and they contact you directly.

All fields are required unless marked (optional).

Which installers should we send your request to?Choose up to 3
What do you need a quote for?Choose one
Enter your full name
For example, [email protected]
Only needed if you would like a phone call
For example, DE1 1AA
For example, the type of property, whether you have off-street parking, and when you'd like the work done. Don't include web links.You can enter up to 1000 characters
How would you like the installer to contact you?Choose one