Home › Nottinghamshire › Newark and Sherwood › Southwell

Heat pump, solar panel and battery installation in Southwell

We list 5 heat pump installers, 6 solar panel installers, 7 home battery installers and 63 EV charger installers within 20 km of Southwell or based in Newark and Sherwood. In the 2021 Census area covering central Southwell, 3.3% of households used oil or LPG only for central heating, according to ONS Census 2021 TS046. 63 home energy installer listings are within 20 km of Southwell centre in our directory; the nearest, AJR Developments Limited, is about 8.1 km away. Counting firms within 20 km or based anywhere in Newark and Sherwood, the directory has 63 for EV chargers, 7 for battery storage, 6 for solar panels and 5 for heat pumps. Distances are straight-line estimates.

23 listings shown8.1 km nearest straight-line distance
Ask nearby installers for a free quote
Row of brick homes beside a broad river and tree-lined bank

Heat pump, solar panel and battery installation in Southwell

Compare nearby directory firms, current heat pump grant and VAT rules, and the planning checks to make before arranging work in Southwell.

Directory firms by technology

Counts combine listings within 20 km straight-line of the Southwell centre and firms based anywhere in Newark and Sherwood, deduplicated by business. They show directory service labels and proximity, not a guarantee that each firm covers every postcode. No MCS register data is used or displayed in these counts.

Grant and VAT

GOV.UK lists £7,500 for eligible air-to-water and ground-source heat pump installations. For eligible off-gas-grid homes replacing oil or LPG heating with either type, it lists £9,000. Other system and fuel categories have different values, and eligibility conditions apply. GOV.UK Boiler Upgrade Scheme grant values.

Qualifying residential installation work for solar panels, air-source and ground-source heat pumps, and electrical storage batteries is zero-rated for VAT through 31 March 2027. HMRC says equipment supplied without installation is standard-rated. HMRC VAT Notice 708/6, sections 2.3, 2.7, 2.11, 2.14, 2.15 and 2.19.

Planning checks in Southwell

Local planning authority: Newark and Sherwood District Council is the local planning authority for Southwell. Newark and Sherwood District Council: planning service. Planning application contacts: Newark and Sherwood District Council planning for properties in Southwell.

Conservation area: Southwell Conservation Area is designated. The council’s Southwell appraisal discusses whether an Article 4 Direction should be introduced; its current directions page links to a heritage map for address checks. Check the current map before relying on permitted development rights. Newark and Sherwood District Council: Southwell Conservation Area appraisal. Newark and Sherwood District Council: Article 4 directions and heritage map.

In England, an air-source heat pump may be permitted development only when all applicable limits and conditions are met. Siting restrictions apply in conservation areas and World Heritage Sites; permitted development rights do not apply to installations within the curtilage of a listed building. Article 4 directions and planning conditions can also affect rights. Planning Portal: air-source heat pump planning permission.

Solar panels on a house may be permitted development in England if the relevant limits and conditions are met. Under the updated rules, equipment in a conservation area must not be fitted to a wall, balcony or roof enclosure fronting a highway; a transition lets some installations use the previous rules until 27 August 2027. Siting and property status matter, so check the full rules with the local planning authority before work starts. Planning Portal: detailed solar panel rules for homes.

If proposed work would affect the character of a listed building, listed building consent is required; planning permission may also be needed. Planning (Listed Buildings and Conservation Areas) Act 1990, sections 7 and 8. Check with the local planning authority identified above before work starts.

Electricity network: National Grid Electricity Distribution's postcode checker returns 'WPD (East Midlands)' for NG25 0HE in Southwell. Check the full postcode for a property to confirm its distributor. National Grid Electricity Distribution postcode check for NG25 0HE.

Guides and tools

Questions about installations in Southwell

How do I find heat pump installation firms in Southwell?

The directory lists 5 heat pump firms within 20 km of Southwell centre or based in Newark and Sherwood. This is a proximity-based count, not confirmation that every firm covers every postcode.

Where can I compare renewable heating services in Southwell?

The directory lists 5 heat pump firms and 6 solar panel firms within 20 km of Southwell centre or based in Newark and Sherwood. Counts show listing locations and service labels, not confirmed coverage of every postcode.

Can I get solar panel installation in Southwell?

Solar panels may be permitted development in England if all applicable limits and conditions are met. Southwell has a designated Conservation Area, where siting rules apply. Check the address and proposal with Newark and Sherwood District Council.

How many home battery installation firms are listed near Southwell?

The directory lists 7 battery storage firms within 20 km of Southwell centre or based in Newark and Sherwood. This is a proximity-based count, not confirmation that every firm covers every postcode.

What heat pump grant is available in Southwell?

GOV.UK lists £7,500 for eligible air-to-water and ground-source heat pumps. Eligible off-gas-grid homes replacing oil or LPG heating with either type may qualify for £9,000. Other categories and eligibility conditions apply.

Do heat pumps and solar panels need planning permission in Southwell?

They may be permitted development in England if the relevant limits and conditions are met. Southwell has a designated Conservation Area, and the council appraisal discusses a possible Article 4 Direction. Check the current heritage map for the address before work starts.

Local sources checked 27 November 2026. Planning requirements depend on the property and the proposed installation.

Local home energy installers

These are listings from our live directory. EV chargepoint authorisation details for OZEV listings are sourced from the GOV.UK OZEV installer finder; distances use the location coordinates recorded for each directory entry. The OZEV authorisation shown on a profile applies to EV chargepoint work. Distances are straight-line estimates, not driving distances. Unclaimed heat-pump, solar, battery and EV-charger listings in this district are based on Companies House records and the firm's own website; they are not OZEV-authorised.

B&R Electrics

Mansfield · NG21

About 13.5 km from the Southwell centre

EV chargers

OZEV-authorised for EV chargers

Showing the 20 closest directory listings within 20 km of the town centre.

The list also includes 3 unclaimed business listings in Newark and Sherwood.

Installers near Southwell by technology

Heat pump installers near Southwell

5 listings near Southwell or based in Newark and Sherwood say they offer heat pumps.

Browse heat pump installers in Newark and Sherwood

The Boiler Upgrade Scheme guide explains current grant eligibility for heat pumps.

Cold snap coming? See the 7-day heat pump cold-weather forecast for Southwell and what frost and defrost mean for your heat pump.

Check what a heat-pump quote includes with the AI quote checker.

Solar panel installers near Southwell

6 listings near Southwell or based in Newark and Sherwood say they offer solar panels.

Browse solar panel installers in Newark and Sherwood

Check the solar and heat pump planning guide, then estimate local generation and payback with the solar payback calculator.

Home battery installers near Southwell

7 listings near Southwell or based in Newark and Sherwood say they offer battery storage.

Browse battery storage installers in Newark and Sherwood

The home battery guide covers adding storage to solar; compare tariff-shifting savings with the home battery savings calculator.

EV charger installers near Southwell

63 listings near Southwell or based in Newark and Sherwood say they offer EV chargers.

Browse EV charger installers in Newark and Sherwood

The GOV.UK OZEV installer finder lists authorised EV chargepoint installers; our DNO notification guide explains the home charger process.

The directory does not verify MCS certification. Before booking solar or heat pump work, check the company on MCS's Find an Installer checker.

Planning: heat pumps and solar panels in Southwell

National Park boundary: Southwell is outside the Peak District National Park.

Local planning authority: Newark and Sherwood District Council.

Conservation areas: Southwell Conservation Area is designated. Check the council map for the boundary at a property address.

For a heat pump installation in Southwell, an air source heat pump may be permitted development if it meets all the relevant limits and conditions. In a conservation area or World Heritage Site, it cannot be installed on a wall or roof facing a highway, or closer to a highway that bounds the property than the nearest part of the home. On other land, including National Park land outside a conservation area or World Heritage Site, a unit on a highway-facing wall cannot be above ground-floor level. Check for property-specific restrictions such as an Article 4 Direction. Read our heat pump planning permission guide.

For a solar panel installation in Southwell, panels on a flat roof on Article 2(3) land (including a National Park or conservation area) need a prior-approval application before work starts; the authority decides whether approval is required. A stand-alone system on Article 2(3) land and within five metres of the property's curtilage boundary also needs a prior-approval application. Current rules exclude panels on a wall, balcony or roof enclosure facing a highway in a conservation area or World Heritage Site. The rules changed on 27 August 2026, with transitional arrangements for some installations until 26 August 2027. Read our solar planning guide.

If a property is listed, works that affect its character as a listed building need listed building consent; planning permission may also be required.

This is general guidance, not planning advice; check with Newark and Sherwood District Council before you install. Checked 18 November 2026.

How homes in Southwell are heated

In the Census 2021 area that covers central Southwell (Southwell, 3,216 households), 81.2% of households had mains gas as their only central heating, compared with 74.5% across Newark and Sherwood.

3.3% (106 households) used oil or tank/bottled gas (LPG) only (8.1% across Newark and Sherwood), and 4.9% (156) used electric heating only. 19 households already used renewable energy only, such as a heat pump.

Oil and LPG heating usually means a home is not on mains gas. If you are weighing up a heat pump in Southwell, the Boiler Upgrade Scheme guide explains which existing heating systems qualify, and the off-gas-grid homes data page compares every East Midlands council area.

Source: Office for National Statistics, Census 2021 TS046 central heating (Nomis), area Newark and Sherwood 008 (E02005900); Open Government Licence v3.0. The area was found from the postcode nearest the Southwell centre (postcodes.io); area name from the House of Commons Library MSOA names. Census areas do not match town boundaries exactly, and heating may have changed since 21 March 2021.

District-level figures for Newark and Sherwood

Public EV charging: Newark and Sherwood had 165 public chargepoints on 1 October 2026. This is a Newark and Sherwood council-area figure, not a count for Southwell. Source: DfT EVCI0102 (Zapmap data, Open Government Licence v3.0).

Solar PV: DESNZ recorded 5,145 solar PV installations in Newark and Sherwood at the end of 2025. This is a district-level figure, not a count for Southwell; DESNZ says the 2025 allocations may be revised. Source: DESNZ renewable electricity statistics (Open Government Licence v3.0).

Useful next steps

OZEV installer records were last checked against the GOV.UK finder on 14 October 2026. Unclaimed business listings are based on Companies House records and website evidence. Technology tags are not an MCS endorsement.

Get free quotes from installers in Southwell

Free and no obligation. We send your request to the installer(s) you choose and they contact you directly.

All fields are required unless marked (optional).

Which installers should we send your request to?Choose up to 3
What do you need a quote for?Choose one
Enter your full name
For example, [email protected]
Only needed if you would like a phone call
For example, DE1 1AA
For example, the type of property, whether you have off-street parking, and when you'd like the work done. Don't include web links.You can enter up to 1000 characters
How would you like the installer to contact you?Choose one