Guides › Commercial, workplace and fleet EV charger installers in the East Midlands
Commercial, workplace and fleet EV charger installers in the East Midlands
This guide is for employers and fleet operators planning chargepoints at a workplace, depot or business site. Browse the OZEV-authorised EV installer listings by county and district, then confirm directly that a firm takes commercial or fleet work and can handle the WCS claim for your project.
Last checked: 24 November 2026. Schemes change, so confirm on GOV.UK before you commit.
Not sure which grant applies to you? Try the 1-minute grant eligibility checker.
What the directory listings tell you
Our area counts use East Mids Energy listings sourced from the GOV.UK OZEV-authorised EV chargepoint installer finder. OZEV-authorised status is required for an installer to claim a WCS voucher, but our records do not show commercial or fleet specialism or whether a firm will handle your particular claim. Confirm this with the business before you apply.
Sources: GOV.UK – Find an electric vehicle chargepoint installer; GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026)
How a workplace or fleet installation differs from a home install
A workplace or depot project can involve several chargepoints and a different charging schedule from a single home socket. GOV.UK advises discussing multiple workplace or depot chargepoints with the network operator early; the number and speed of the chargepoints affect the connection requirements. Ask for a site survey covering the existing supply, expected peak demand and any load management.
For an eligible workplace, the WCS is a voucher route. The organisation applies first; after approval it gives the voucher to an OZEV-authorised installer, who checks it, installs the approved equipment, deducts the grant from the invoice and submits the claim.
Sources: GOV.UK – Connecting electric vehicle chargepoints to the electricity network; GOV.UK Find a grant – Workplace Charging Scheme (eligibility, dates, how to apply); GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026)
DNO connection: notification or application
The Distribution Network Operator (DNO) process depends on the proposed connection. GOV.UK says some chargepoints use a connect-and-notify route after installation, while an apply-to-connect installation needs the application submitted and approval received before work starts. For several workplace or depot chargepoints, discuss the project with the DNO early. Ask the installer to identify the correct route, submit the required paperwork and give you confirmation.
Sources: GOV.UK – Connecting electric vehicle chargepoints to the electricity network; GOV.UK – How to register energy devices in homes or small businesses; Energy Networks Association – Connecting electric vehicles and heat pumps to the networks
Smart charging, public access and employee tax
Smart Charge Points Regulations cover chargepoints sold in Great Britain for private workplace use. Ask for the selected model’s statement of compliance. Public chargepoints and rapid chargepoints are excluded from these smart-chargepoint rules.
If a chargepoint is intended primarily for use by the general public, the Public Charge Point Regulations 2023 apply. The regulations distinguish public chargepoints from those intended solely for employees, contractors or workplace visitors. Check the access model before deciding which requirements apply.
HMRC says electricity supplied through workplace charging facilities can qualify for a benefit-in-kind exemption when the facilities are at or near the workplace, available generally to employees at that workplace, and used for a vehicle in which the employee is driver or passenger. The exemption does not apply to optional remuneration arrangements.
Sources: GOV.UK – Regulations: electric vehicle smart charge points; The Electric Vehicles (Smart Charge Points) Regulations 2021; The Public Charge Point Regulations 2023; HMRC – Taxable fuel provided for company cars and vans, chapter 13: workplace charging exemption
VAT on a commercial EV charger installation
Do not assume the VAT treatment for a home charger applies to a commercial project. HMRC’s energy-saving-materials relief covers a defined list of materials and has a residential or qualifying charitable-building scope; HMRC explains building and construction work under a separate notice. Ask for an itemised quote that states the VAT treatment for each part of the work, and check project-specific construction questions with HMRC or a tax adviser. For a residential retrofit, see our home EV charger VAT guide.
Sources: HMRC – Energy-saving materials and heating equipment (VAT Notice 708/6); HMRC – Buildings and construction (VAT Notice 708)
What to ask a commercial EV installer
Use the same questions when you compare quotes:
- Commercial and fleet work: Do you take workplace or fleet projects, and will you handle the WCS voucher and claim for this site?
- Site survey: Will the survey check the electrical supply, expected peak demand, chargepoint locations and cable or ground works?
- Load management: What load-management approach is included, and how does it affect the fleet charging schedule?
- DNO process: Which DNO serves the site, does the project need an application or notification, who submits it, and when can installation start?
- WCS voucher: Will you check the voucher, show the grant deduction on the invoice and submit the claim within the voucher period?
- Quote and compliance: Is the quote itemised with VAT shown, and will you provide the selected chargepoint’s smart-compliance statement?
Sources: GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026); GOV.UK – Connecting electric vehicle chargepoints to the electricity network; GOV.UK – How to register energy devices in homes or small businesses; GOV.UK – Regulations: electric vehicle smart charge points
How much can a business claim through the Workplace Charging Scheme?
For eligible workplace installations completed from 1 April 2026, WCS covers up to 75% of purchase and installation costs including VAT, capped at £500 per socket and 40 sockets across all sites per applicant. Funding is currently scheduled to close on 31 March 2027. The organisation applies for a voucher before the installer completes the work.
Source: GOV.UK Find a grant – Workplace Charging Scheme (eligibility, dates, how to apply); GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026); GOV.UK – Changes to EV chargepoint grant schemes from 1 April 2026
Does an OZEV-authorised listing mean the firm does commercial or fleet work?
No. The directory records OZEV authorisation, but it does not record which firms accept commercial or fleet work or will handle a WCS claim for your site. Ask the installer directly before you apply.
Source: GOV.UK – Find an electric vehicle chargepoint installer; GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026)
Does a workplace charger always need a DNO application before installation?
No single route applies to every project. Some installations use connect and notify, while an apply-to-connect route requires DNO authorisation before installation. Ask the installer which process applies and who will submit it.
Source: GOV.UK – Connecting electric vehicle chargepoints to the electricity network; GOV.UK – How to register energy devices in homes or small businesses; Energy Networks Association – Connecting electric vehicles and heat pumps to the networks
Do workplace chargepoints have to meet the smart charger rules?
Chargepoints sold in Great Britain for private workplace use are covered by the Smart Charge Points Regulations. Public chargepoints and rapid chargepoints are excluded from those rules. A chargepoint intended primarily for public use is covered by the Public Charge Point Regulations 2023.
Source: GOV.UK – Regulations: electric vehicle smart charge points; The Electric Vehicles (Smart Charge Points) Regulations 2021; The Public Charge Point Regulations 2023
Is workplace charging a taxable benefit for employees?
HMRC’s exemption can apply when facilities are at or near the workplace, available generally to employees at that workplace, and used for a vehicle in which the employee is the driver or a passenger. Optional remuneration arrangements are excluded.
Source: HMRC – Taxable fuel provided for company cars and vans, chapter 13: workplace charging exemption
What VAT rate applies to a commercial charger installation?
It depends on the work and the VAT rules that apply to the project. HMRC’s energy-saving-materials notice covers specified materials within a residential or qualifying charitable-building scope, while building work has separate rules. Ask for an itemised quote showing VAT and check any construction-specific treatment with HMRC or a tax adviser.
Source: HMRC – Energy-saving materials and heating equipment (VAT Notice 708/6); HMRC – Buildings and construction (VAT Notice 708); GOV.UK – VAT rates on different goods and services
OZEV-authorised EV installer listings by county
County totals count OZEV-authorised EV chargepoint installer listings in our directory. Open a county hub to browse local records:
- Derbyshire: 91 OZEV-authorised EV chargepoint installers listed
- Nottinghamshire: 87 OZEV-authorised EV chargepoint installers listed
- Leicestershire: 81 OZEV-authorised EV chargepoint installers listed
- Staffordshire: 122 OZEV-authorised EV chargepoint installers listed
The listing data records OZEV authorisation. It does not show whether a firm takes commercial or fleet work, or will handle a WCS claim for your site; confirm both directly.
District EV installer pages
These district pages are available for the places named in recent East Midlands searches:
Find an installer near you
Browse OZEV-authorised EV chargepoint installers in Derbyshire, Nottinghamshire, Leicestershire or Staffordshire, or read our grants guide.
Ready for quotes?
Choose your area and send a free request to up to three local installers.
Get free quotesSources used on this page: GOV.UK Find a grant – Workplace Charging Scheme (eligibility, dates, how to apply) · GOV.UK – Workplace Charging Scheme: guidance for installers (updated 1 April 2026) · GOV.UK – Changes to EV chargepoint grant schemes from 1 April 2026 · GOV.UK – Find an electric vehicle chargepoint installer · GOV.UK – Connecting electric vehicle chargepoints to the electricity network · GOV.UK – How to register energy devices in homes or small businesses · Energy Networks Association – Connecting electric vehicles and heat pumps to the networks · GOV.UK – Regulations: electric vehicle smart charge points · The Electric Vehicles (Smart Charge Points) Regulations 2021 · The Public Charge Point Regulations 2023 · HMRC – Taxable fuel provided for company cars and vans, chapter 13: workplace charging exemption · HMRC – Energy-saving materials and heating equipment (VAT Notice 708/6) · HMRC – Buildings and construction (VAT Notice 708) · GOV.UK – VAT rates on different goods and services
More guides
- Energy price cap January 2027: East Midlands homes
- Can I get a home EV charger with no driveway?
- EV charger installation cost UK (2026)
- EV charger grant for renters and flat owners (2026)
- How to choose an EV charger installer
- EV charging for terraced houses with on-street parking
- Smart charger rules for home EV chargepoints
- EV charger grant for landlords (2026)
- How to apply for an EV charger grant
- Warm Homes Fund & Solar Panel Loans
- Free boiler and heating grants in Nottingham (2026)
- Boiler Upgrade Scheme heat pump grant (2026): eligibility and amounts
- Biomass boiler grant: the Boiler Upgrade Scheme explained (2026)
- Do I need planning permission for a home EV charger? (England, 2026)
- Do I need to tell the DNO about solar panels or a home battery? G98 vs G99 explained
- Should I add a home battery to my solar panels?
- Tesla Powerwall installers in the East Midlands
- Home EV charger DNO notification: National Grid (2026)
- VAT on EV charger installation: usually 20%, not 0% (UK 2026)
- Do I need permission for a cross-pavement EV charger channel? (England, 2026)
- Workplace EV charging East Midlands: WCS grant
- Do I need planning permission for solar panels or a heat pump? (England, 2026)
- How much does an air source heat pump cost in 2026? Install and running costs (UK)
- Replacing storage heaters: costs and electric heating options
- myenergi zappi error codes: Comms Faults 26 and 45
- Ohme charger error codes: lights, app messages and what to do
- Pod Point charger not charging: lights, fault codes and what to do
- Hypervolt charger not charging: lights, app messages and what to do
- Heat pump not heating? Safe checks before you call an engineer
- Mitsubishi Ecodan error codes: what they mean and what to do
- Boiler broken: repair it or switch to a heat pump?
- How to compare heat pump quotes (with a printable checklist)
Grants & tariffs, in your inbox
Occasional updates. We'll email you a link to confirm. Unsubscribe any time. See our privacy notice.