Guides › Do I need to tell the DNO about solar panels or a home battery? G98 vs G99 explained

Do I need to tell the DNO about solar panels or a home battery? G98 vs G99 explained

Last checked: 25 October 2026 9 questions answered

Yes. If you add solar panels or a home battery that can operate in parallel with the electricity network, the DNO needs to know. For a compliant small solar-generation system, G98 is usually fit-and-notify; larger systems need a G99 application before installation. Batteries need a separate check: NGED normally processes storage under G99 because it can export, with a specific fast-track route for some export-limited solar-and-battery systems. For most East Midlands homes the DNO is National Grid Electricity Distribution (NGED); your installer can confirm who serves your postcode.

Last checked: 25 October 2026. Schemes change, so confirm on GOV.UK before you commit.

Not sure which grant applies to you? Try the 1-minute grant eligibility checker.

Estimate local solar generation and simple payback in the solar payback calculator.

Compare tariff-shifting savings in the home battery savings calculator, or include a battery in the solar payback calculator.

What are G98 and G99?

They are Energy Networks Association (ENA) engineering recommendations for connecting generation and storage that can operate in parallel with the public electricity network. G98 covers compliant smaller generation systems; G99 covers larger systems and equipment that does not meet G98 requirements. NGED’s storage guidance says batteries normally use its G99 application process because they can export, subject to a specific fast-track route. These are connection rules, separate from planning permission and any export tariff.

Source: Energy Networks Association – Connecting generation to the electricity networks (EREC G98 / G99); Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); National Grid Electricity Distribution – G99 connection procedures; National Grid Electricity Distribution – Connecting Energy Storage Guidance

How does the 16A per phase limit apply to solar and batteries?

For a single-phase supply, 16A per phase is equivalent to 3.68kW. NGED says a solar system’s connection rating is based on the inverter’s continuous steady-state rating, not simply the panels’ DC capacity. ENA guidance says the total registered capacity of inverter-connected generating units at the property is used, and includes electricity storage. A battery’s kWh figure is how much energy it stores; give your installer the battery and inverter power ratings and details of any existing generation so they can check the correct route. For a battery, do not rely on the threshold alone: NGED normally uses G99 for storage even when its rating is small.

Source: Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); National Grid Electricity Distribution – G99 connection procedures; National Grid Electricity Distribution – Connecting Energy Storage Guidance

Can I install first and tell the DNO afterwards?

For a compliant G98 installation at one property, you can normally install and commission first; your installer must send the G98 installation information to the DNO within 28 days. If G99 applies, the application must go to the DNO before generation equipment is installed, so allow the DNO to assess and agree the connection first. A G99 job still has commissioning and notification paperwork after the work.

Source: Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); National Grid Electricity Distribution – G98 connection procedures; National Grid Electricity Distribution – G99 connection procedures

Does a home battery count, and can an export limit change the route?

Yes. A battery may import electricity while charging and export it later, so the DNO treats it as demand when importing and generation when exporting. ENA says adding storage to solar will often take the total connected generation above the G98 limit, and NGED normally uses G99 for storage because it can export. An ER G100 export-limitation scheme monitors net export and controls generation or storage so the system stays within the DNO-agreed export cap; this can affect which connection route is available. NGED has a specific G99 fast-track route for some single-phase solar-and-storage systems where each is G98-compliant and the scheme keeps export at or below 16A per phase. The installer submits an export-limitation application as well as the generation paperwork, so an export limit does not by itself remove the need to tell the DNO.

Source: Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); National Grid Electricity Distribution – Connecting Energy Storage Guidance; National Grid Electricity Distribution – Export Limitation

Who normally submits the DNO paperwork?

Usually your solar or battery installer. ENA’s guide says the installer submits the G98 notice and should submit a G99 application on your behalf; Energy Saving Trust also says the installer registers the solar system and battery with the DNO. Ask your installer to confirm which route applies and give you a copy of the application or notification.

Source: Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); Energy Saving Trust – Rooftop solar panel installation: step-by-step guide

Which DNO covers East Midlands homes?

National Grid Electricity Distribution (NGED) serves the East Midlands area. If your property is on an independent network instead, confirm the operator for your postcode with the ENA network-operator lookup or ask your installer.

Source: National Grid Electricity Distribution – Frequently asked questions; Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); Energy Networks Association – Connecting electric vehicles and heat pumps to the networks

Is this the same process as notifying the DNO about an EV charger?

No. A standard home EV charger only draws electricity and uses the ENA’s separate EV and heat-pump connection process. Solar and batteries can generate or export, so their connection is handled under G98 or G99. A bidirectional charger that can send power back to the grid is different. Read our <a href="/guides/ev-charger-dno-notification/">EV charger DNO notification guide</a> for the home-charger process.

Source: Energy Networks Association – Connecting electric vehicles and heat pumps to the networks; Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024); GOV.UK – How to register energy devices in homes or small businesses

Is DNO notification the same as signing up for an export tariff?

No. DNO notification or approval is about connecting equipment safely to the local network. The Smart Export Guarantee (SEG) is a separate arrangement with an electricity supplier for payment for eligible exported electricity; check Ofgem’s current SEG guidance and your supplier’s terms.

Source: Ofgem – Smart Export Guarantee (SEG); National Grid Electricity Distribution – G98 connection procedures

How can I check an installer’s certification or an existing MCS certificate?

Firms in our solar and home battery directories say on their own websites that they offer these services; we do not confirm their certification. Use MCS’s own Find an Installer search to check a firm’s certification. For an MCS certificate query about a particular installation, use MCS’s certificate queries service. We do not republish MCS listings or certificate data.

Source: MCS – Find an Installer (MCS’s own search); MCS – MCS certificate queries

Solar and home battery installers in the East Midlands

Already have solar and considering storage? Read our home battery decision guide. Our solar directory and home battery directory list firms that say on their own websites that they offer these services; we do not confirm certification. To check a firm, use MCS’s own Find an Installer search, and use MCS certificate queries if you need to check a certificate for an installation.

Ready for quotes?

Choose your area and send a free request to up to three local installers.

Get free quotes

Sources used on this page: Energy Networks Association – Connecting generation to the electricity networks (EREC G98 / G99) · Energy Networks Association – Distributed Generation Connection Guide: G98 & G99 (March 2024) · National Grid Electricity Distribution – G99 connection procedures · National Grid Electricity Distribution – Connecting Energy Storage Guidance · National Grid Electricity Distribution – G98 connection procedures · National Grid Electricity Distribution – Export Limitation · Energy Saving Trust – Rooftop solar panel installation: step-by-step guide · National Grid Electricity Distribution – Frequently asked questions · Energy Networks Association – Connecting electric vehicles and heat pumps to the networks · GOV.UK – How to register energy devices in homes or small businesses · Ofgem – Smart Export Guarantee (SEG) · MCS – Find an Installer (MCS’s own search) · MCS – MCS certificate queries

More guides

Grants & tariffs, in your inbox

Occasional updates. We'll email you a link to confirm. Unsubscribe any time. See our privacy notice.